Interface compatibility
Breaking tool, resource, prompt, schema, and response drift.
Combine contract drift, prompt behavior, SLOs, verified security findings, RAG quality, and benchmark gates. Prooflane shows what blocks shipping, what changed, and the shortest evidence-backed path to green.
$ prooflane gate --suite release contracts READY prompts READY performance READY security BLOCK RAG REVIEW benchmark READY BLOCK reason: newly verified critical breach next: review SEC-042 and re-run control
Policy precedence prevents a high average from hiding a critical regression or an inconclusive control.
Breaking tool, resource, prompt, schema, and response drift.
Golden outcomes, structured assertions, safety expectations, and tool traces.
Latency tails, throughput, failures, retries, and work completed inside budget.
Breaches, exposures, poisoning, severity, novelty, and inconclusive controls.
Quality, grounding, drift, contracts, answer chain, and fault resilience.
Quality, cost, latency, reliability, security gates, and methodology health.
See release readiness, the blocking pillar, change since last green, and the shortest path back to deployable.

Run the unified gate, inspect the blocking reason, open its source evidence, remediate the fixture, and re-run to green.
prooflane gate --suite releaseprooflane runs show latestprooflane scans show <scan-id>prooflane gate --suite release --githubThis is an existing Prooflane product screenshot. Values are illustrative and are not a customer deployment decision.

A release decision links back to each contributing run, policy, control, case, and evidence artifact.
Normalize evidence from every enabled assurance pillar and environment.
Apply baselines, thresholds, severity, novelty, and confidence requirements.
Return pass, warn, or block with the exact policy reasons and source evidence.
Keep run history and trends so regressions feed the next release decision.
One decision, with the evidence and policy behind every outcome.
30-day full-access trial. No credit card required.
Prooflane is beta software. Deployment decisions are automated and informational, may be incomplete, and do not replace engineering, security, legal, compliance, or business judgment. Terminal output and screenshot values are illustrative.